Your search returned 2 results.

Sort
Results
1.
Image from Google Jackets
Rapid environmental impact assessment study report for proposed ferro alloy plant(21,780 MTPA of Production)(Installatio*6.5 arc furnaces) porposed by MDA Project India by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: Hyderabad ; Manasa nature tech Pvt Ltd ; 2009
Availability: Items available for loan: Dr VKRV Rao Library (1)Call number: D333.7 EIA-2.

2.
Image from Google Jackets
Environmental impact assessment study report for sponge Iron, Pig,Sinter manufacturing plant, TMT Bar manufacturing and capative power plant(WHRB) of Electrotherm India LTD. by
Material type: Text Text; Format: print ; Literary form: Not fiction
Publication details: Kutch ; 2008
Availability: Items available for loan: Dr VKRV Rao Library (1)Call number: D333.7 EIA-3.